  |
FORBIO
Het belang van boomsoortenbiodiversiteit voor het functioneren van bosecosystemen
- Cluster van de projecten
- Fefocon,
- Econet,
- Castec,
- Safe,
- Belfor,
- Xylobios,
- Impecvoc,
- Belgian Biodiversity Platform
- Duur van het project: 15/12/2007- 31/03/2010
- Budget: 99.698 €
- Sleutelwoorden: functioneren van ecosystemen, functionele biodiversiteit, experimenten, sleutelsoorten, gemengde bossen
- Promotoren: Kris Verheyen, UGent
- Contractnummer: SD/CL/01
Documentatie
- Technische fiche
- Projectwebsite
- Eindrapporten:
- Final report: Assessment of the effects of tree species BIOdiversity on FORest ecosystem functioning
- Annex 1: Copy of the publications
- Annex 1.1: Special FORBIO issue of BosRevue
- Annex
1.2: Special FORBIO issue of Forêt Wallone
- Annex
1.3: FORBIO posters presented at the Foire de Libramont
- Annex
1.4: FORBIO-related contributions for the Scientific Block - Calender 2011 of Natuur & Techniek
- Annex 2: Minutes of the follow-up committee meetings
- Annex 2.1: Minutes of the first Follow Up Committee Meeting
- Annex 2.2: Minutes of the second Follow Up Committee Meeting
- Annex 2.3: Minutes of the TreeDivNet workshop
- Annex 3: Announcement of forbio conference on 04/02/11
- Annex 4: Media coverage of the forbio-experiment
- Samenvatting: Het belang van boomsoortenbiodiversiteit voor het functioneren van bosecosystemen
|
 |
PM2TEN
Particles, Mobility, Physical activity, Morbidity and The Environment Network
- Cluster van de projecten
- Duur van het project: 15/12/2007- 14/12/2009
- Budget: 99.402 €
- Sleutelwoorden: Stadsaardrijkskunde, luchtvervuiling, fijnstoffen, hart-longziekten, meteorologie
- Promotoren: Luc Int Panis, VITO - Romain Meeusen, VUB - Benoit Nemery & Tim Nawrot, KULeuven
- Contractnummer: SD/CL/02
Documentatie
- Technische fiche
- Projectwebsite
- Eindrapporten:
- Report (phase
1): Particles, Mobility, Physical activity, Morbidity and The Environment Network
|
 |
Air Quality
Integratie van de bestaande methodes om (bio)monitoringprogramma's in verband met de binnen- en buitenluchtkwaliteit te ontwikkelen
- Cluster van de projecten
- MIC-ATR
- PARHEALTH
- ANIMO
- SHAPES
- Duur van het project: 15/09/2012- 31/01/2012
- Budget Fase 1: 99.990 €
- Sleutelwoorden: Binnen/buiten luchtkwaliteit, biomonitoring, (cardio)ademhalingsaandoeningen, milieu blootstelling, millieu en gezondheid
- Promotoren:Anne Vancauwenberge, HPH - Rosette Van Den Heuvel, VITO - Luc Int Panis, VITO - Tim Nawrot / Nemery Benoit, KUL
- Contractnummer: SD/CL/04
Documentatie
- Technische fiche
- Projectwebsite
- Eindrapporten:
- Final Report: Integration of existing approaches toward (bio)surveillance in relation with indoor and outdoor air quality
- Samenvatting van de resultaten: Integration of existing approaches toward (bio)surveillance in relation with indoor and outdoor air quality
|
 |
SUDEM-CLI
Effect van klimaatverandering op rivierhydrologie en ecologie: een gevalsstudie voor interdisciplinair beleidsgericht onderzoek
- Cluster van de projecten
- Duur van het project:1/04/2008- 31/03/2010
- Budget Fase 1: 94.932€
- Sleutelwoorden: Gevolgen van de klimaatverandering, Eecologie, Overstromingsgebieden
- Promotoren: Patrick Meire, UA - Patrick Willems, KULeuven - JP Van Ypersele, UCL
- Contractnummer: SD/CL/003
Documentatie
- Technische fiche
- Projectwebsite
- Eindrapporten:
- Final Report: Impact of climate change on river hydrology and ecology: A case study for interdisciplinary policy oriented research
|
 |
BEES
BElgium Ecosystem Services - A new vision for society–nature interactions
- Cluster van de projecten
- WETMAT
- MANUDYN I & II
- ADAPT
- LUSI
- Other:
- Ccaspar
Climate change And changes in SPAtial structures in Flanders (SBO-IWT)
- ECOPLAN
Planning for ecosystem services (voortraject SBO-IWT)
- Duur van het project: 15/12/2012- 31/01/2012
- Budget Fase 1: 99.227€
- Sleutelwoorden: -
- Promotoren: Patrick Meire, UA - Inge Liekens, VITO - Francis Turkelboom, INBO - Luc De Meester, KUL - Edwin Zaccaï / Tom Bauler / Lé Sebastien, ULB - Alain Peeters, RHEA
- Contractnummer: SD/CL/005
Documentatie
|
   |
BE- REDDi
Development of Belgian REDD Information Systems
- Cluster van de projecten
- SAFE
- Aardobservatie projecten
- NEA Forest: Forest monitoring for greenhouse gas information in Northeastern Asia (ESA).
- Method development and model adjustments for expanding the environmental costing model with greenhouse gases (project for Department Environment, Nature and Energy).
- Saint Lucia forests inventory for validating REDD credits (VITO funded project, presented at side event UNFCCC conference Bonn June 2009).
- Duur van het project: 15/12/2012- 31/01/2012
- Budget Fase 1: 99.844€
- Sleutelwoorden:
- Promotoren: Tom Dauwe, VITO - Else Swinnen, VITO - Eric Lambin, UCL - Bruno Verbist, KUL - Jan Nyssen, UG
- Contractnummer: SD/CL/010
Documentatie
|
 |
FORUM
Establishment of an ad hoc forum for the comparison of the TIMES-MARKAL and LEAP model as a support for Belgian long-term energy policy
- Cluster van de projecten
- Duur van het project: 15/12/2012- 31/01/2012
- Budget Fase 1: 98.971€
- Sleutelwoorden: Energiesysteem, modellering, MARKAL-TIMES, SEPIA-LEAP, lange-termijn energiebeleid
- Promotoren: Aviel Verbruggen, UA - Wouter Nijs, VITO
- Contractnummer: SD/CL/006
Documentatie
- Technische fiche
- Projectwebsite
- Eindrapporten:
- Final Report: Establishment of an ad hoc forum for the comparison of the TIMES-MARKAL and LEAP model as a support for Belgian long-term energy policy
- Samenvatting: Oprichting van een ad hoc FORUM voor het vergelijken van de TIMES-MARKAL en LEAP modellen, als ondersteuning voor het Belgische lange termijn energiebeleid
|

|
INTERACT
Accessibility to places and transport : social, economic and environmental interactions
- Cluster van de projecten
- Belspo:
- AP/02: Indicators of accessibility to places and to transport
- CP/42: Determinants of modal choice in trip chains
- CP/63: Impact of "free" public transport on travel behaviour, a case study
- SD/TM/07A: Optimising price and location of parking in cities under a sustainability constraint (SUSTAPARK)
- BL/01/C30 “Time-space patterns of traffic accidents: comparing Brussels with Qing Dao City”. Joint Sino– Belgian project
- International:
- COST 358 ‘Pedestrian Quality Needs’ (2007-2010)
- EU-INTERREG IIIB NWE Community Initiative programme, HST4i and HSTconnect projects: HST impact study. European Commission, Main contractor: SEEDA (UK), with SADL in subcontract of TTR – Transport & Travel Research Ltd. (UK) and Bureau Buiten (NL). (2006-2008)
- EU-6FP-Sustainable Surface Transport, STEPS 'Scenario’s for the Transport System and Energy Supply and their Potential Effects’. International consortium with BCI, The Netherlands, as leading organisation (2004-2006)
- EU-5FP-EVK4-CT-1999-00009, Energy, Environment and Sustainable Development Programme. TRANSPLUS "Transport Planning, Land Use and Sustainability” (2000-2003)
- Duur van het project: 15/12/2012- 31/01/2012
- Budget Fase 1: 100.000 €
- Sleutelwoorden:
- Promotoren: Thérèse Steenberghen, KUL - Isabelle Thomas, UCL - Ann Verhetsel, UA - Vincent Lorant, UCL
- Contractnummer: SD/CL/007
Documentatie
- Technische fiche
- Projectwebsite
- Eindrapporten:
- Final Report: Accessibility to places and transport : social, economic and environmental interactions (INTERACT)
|
 |
PROLIBIC
- Cluster van de projecten
- PROMOCO,
- LIMOBEL,
- BIOSES
- CLEVER
- Duur van het project: 15/12/2012- 31/01/2012
- Budget Fase 1: 88.035€
- Sleutelwoorden:
- Promotoren: Ina De Vlieger, VITO - Maud Nauter, Bureau Fed Plan - Cathy Macharis - VUB
- Contractnummer: SD/CL/008
Documentatie
|
  |
VIRORISK
Risico van het ontstaan van virale ziekjes aangedreven door eco-klimatologische veranderingen en socio-economische
omstandigheden
- Cluster of the research projects
- Duur van het project: 15/12/2012- 31/01/2012
- Budget Fase 1: 99.964€
- Sleutelwoorden: Opkomst van humane virale infecties - klimaat- milieu- en socio-economische veranderingen - risico inventarisatie -
risico management
- Promotoren: Etienne Thiry, ULg - C Zwetkoff / S Brunet, ULg - Marc Coosemans, ITG Anvers
- Contractnummer: SD/CL/009
Documentatie
- Technische fiche
- Projectwebsite
- Eindrapporten:
- Final Report: Risk of emergence of viral diseases driven by eco-climatic changes and socio-economical situations
|